Aerial Gondola as Mass Transit Idea
Charleston area traffic is getting worse every day. This area badly needs mass transportation. Since we are at sea level, subways will not work. For myriad reasons, the bus system is so limited that it is not effective. A monorail was studied years ago, but never got off the ground. I have read hat the cost of building an aerial gondola comes in at between $3 million and $12 million per mile, versus $36 million per mile for light rail systems. For one example, I think the distance between the airport and downtown Charleston s about 12 miles. An aerial gondola might entice some tourists not to bring cars downtown. The route could be broken up by stops near the affordable neighborhoods surrounding Park Circle (about 9 miles from downtown and about 5 miles from the airport). We need ways to get to the beaches without clogging the streets with cars. It is about 12 miles from downtown to Folly Beach by car, but less “as the crow flies.” Check out TheGondolaProject.com to read about cities all over the world that have built aerial gondolas.
Please LOGIN or JOIN to submit a comment.